Choco7905
Member
- Joined
- 14 Jan 2018
- Messages
- 509
- Reaction score
- 594
I got my Xstream fiber connection installed on 15th February 2022.
Took the 799 plan for 3 months.
Installation was completed in just 1.5 hrs.
Coverage is very good. Router is present at the ground floor, 5GHz covers the ground floor, 1st floor & whole campus whereas 2.4GHz covers the terrace & outside our campus till 15mts where airtel's box is present.
Took the 799 plan for 3 months.
Installation was completed in just 1.5 hrs.
Coverage is very good. Router is present at the ground floor, 5GHz covers the ground floor, 1st floor & whole campus whereas 2.4GHz covers the terrace & outside our campus till 15mts where airtel's box is present.
Last edited: