Indian Railway Services Updates

  • Thread starter Thread starter superdudebuddy
  • Start date Start date
  • Replies Replies: Replies 367
  • Views Views: Views 75,836
Why Govt. Not changing Indian Railway System
5DmDhF2.jpg
This the condition most of the travellers because they do not get their ticket confirmed or totally do not get reservation.

And cleaniness is a joke in Indian Railways as Govt. using it as a votebank.
 
Rlys' new time table: 261 trains speeded up, 49 new trains added

The railways also said that it has replaced 141 short distance passenger trains, especially having reversal enroute, by Mainline Electric Multiple Units (MEMUs) and Diesel Electric Multiple Units (DEMUs) in 2018-2019, thereby increasing the overall mobility of the system.

The movement of 27 pairs of trains has been rationalized through adjacent/satellite terminals to obviate the need for reversal of locomotives.

To improve the travel experience, a total of 411 pairs of important long distance trains are now running with LHB coaches,
 
Last edited:
-OgS3-qUg17JyFjQ3z8-vhuaBzRD2KfpnAnbtPqPNskc1E97oDNsYp2XnPXQXBBEROdDD80WQV2GEkjRncmvXCff3pyh__mJ-284aNHMTWBUzCAm=s0-d-e1-ft


Special train for Amarnath yatris from Delhi to Udhampur from 1 july to 15 aug every monday and thursday
 
Last edited:
Last edited:
Indian Railways tickets bonanza! No more waiting for confirmed tickets; additional seats being made available

Indian Railways train tickets bonanza! Planning your journey during this festive season and worried about getting confirmed tickets? If yes, then you would be glad to know that Piyush Goyal-led Indian Railways is taking new measures to ease train journeys for passengers. From now, passengers will not have to wait for getting confirmed train tickets as the Railway Ministry is arranging additional seats/berths for the passengers. With this initiative of the national transporter, passengers will be able to get more confirmed tickets than before. According to the ministry, from now on, the two power car generators in trains that provide electricity to fans, lights, mobile charging points, and other onboard electrical appliances, will not be required. Instead, the trains will be provided with additional berths to accommodate more passengers.
 
Last edited by a moderator:
Back
Top Bottom