Modi to launch:> Asia's longest tunnel in J&K

  • Thread starter Thread starter shawl_who
  • Start date Start date
  • Replies Replies: Replies 14
  • Views Views: Views 1,625

shawl_who

Member
Joined
7 Nov 2012
Messages
3,303
Reaction score
2,840
New Delhi: Prime Minister Narendra Modi will dedicate to the nation Asia’s longest bi-directional road tunnel on the Jammu-Srinagar National Highway on 2 April, which will cut down travel time between the two cities by two hours.
The Rs2,519-crore all-weather tunnel is equipped with world-class safety features and has been built in a record four years on the hilly terrain of Jammu and Kashmir, road transport and highways minister Nitin Gadkari said at a press meet in New Delhi.
“This state-of-the-art 10.89-km tunnel between Udhampur and Ramban in Jammu and Kashmir, an engineering marvel on the most difficult terrain of the Himalayas, was built in a record four years,” the minister said.
Gadkari was accompanied by minister of state in PMO Jitendra Singh, a parliamentarian from Jammu. “The project will result in a saving of Rs27 lakh per day based on traffic estimates and would cut the travel distance between Jammu and Sringar by 41 km,” Gadkari said

He said the tunnel will be equipped with advanced scanners to ward off any security threat. The project forms part of the proposed widening of NH-44 (old NH-1A) from Jammu to Srinagar. The longest highway tunnel in India also happens to be Asia’s longest bi-directional highway tunnel with fully transverse ventilation system, he said.
It also comes with fully-integrated tunnel control system with ventilation, communication, power supply, incident detection, SOS call box and fire fighting. Fitted with intelligent traffic mechanism, the tunnel will have fully automatic smart control and no human intervention will be required for its operations.
The minister added that very few tunnels in the world have fully integrated tunnel control and the Jammu one is fitted with world-class safety features for detection of accidents and fire with a parallel 9-km long escape tunnel.
Elaborating, Gakdari said it will boost economic activity and tourism in the state, adding that it has precluded large-scale deforestation as tree cutting was not required. The work on the twin-tube tunnel, which is part of a 286-km-long four-lane project on the highway, started on 23 May, 2011, in the lower Himalayan mountain range.

The tunnel is located at an elevation of 1,200 metres. Constructed by Infrastructure Leasing and Financial Services (IL&FS), the tunnel is all set to be handed over to National Highway Authority of India (NHAI) soon after its formal inauguration by the Prime Minister.
“The formal trial run was successfully completed for peak and off-peak hours between 9 March and 15 March,” project director, IL&FS, J S Rathore said. Once the tunnel becomes operational, it will reduce traffic jams on National Highway-1A caused by snowfall and avalanches in winter at Patnitop, he said.
Travel will cost an LMV vehicle Rs55 for one side and Rs85 for to-and-fro journey and Rs1,870 for one-month travel. Bigger vehicles like mini buses will have to pay Rs90 as one side toll and Rs135 for both sides. Buses and trucks will have to shell out Rs190 as one-side trip and Rs285 for a two-way journey.

PM Modi to launch Asia’s longest bi-direction road tunnel in J&K on 2 April - Livemint
 
10.89km tunnel:skd

Thanks to engineers & workers:clap
 
Wow, what development. This is great job done by centre. They are fulfilling their development promises. Now no one can point fingers at them and speak bad, as they have shown what they can do for the people.

Next Job: Revoke Article 370
 
anishpai said:
Wow, what development. This is great job done by centre. They are fulfilling their development promises. Now no one can point fingers at them and speak bad, as they have shown what they can do for the people.

Next Job: Revoke Article 370

Decision was taken in d cingress era...
And work started 4 yrs back... when congress was in power ::shyhehe
 
anishpai said:
Wow, what development. This is great job done by centre. They are fulfilling their development promises. Now no one can point fingers at them and speak bad, as they have shown what they can do for the people.

Next Job: Revoke Article 370

J&K development and all nice only while Farmers down south in Tamilnadu worstly affected by drought & 100s of them committed suicide and Now Federations of TN farmers in their 20th day of Protest at Jantar Mantar seeking River Linking across the Country & Farm loan Waiver and one of their major request is to meet Modi.What stops him from meeting the Farmers from Tamilnadu and all that the farmers need before everything is few words of Assurance from Modi.

Is this a way PM of the nation treats farmers??
 
Back
Top Bottom