Delhi-Kolkata bullet train: Reach destination in just 4 hours 56 minutes

rahul1117kumar

Contributor
Joined
21 Jun 2013
Messages
10,365
Reaction score
11,057
If this Delhi-Kolkata bullet train dream transforms into a reality, then travelling time will be cut down to just 4 hours 56 minutes.

A firm commissioned by Indian Railways has suggested that travelling time between Delhi and Kolkata will be cut down to as less as five hours by operating a bullet train on the route.

Bullet train vs Rajdhani

According to the feasibility report by the Spanish firm, the travel time between Delhi and Kolkata on the proposed bullet train will take 4 hours 56 minutes as against the 17 hours in Rajdhani.

The feasibility study is being undertaken for the 1513 km long Delhi-Kolkata high speed corridor.

Speed - 300 km/hour

Bullet train is expected to run about 300 km per hour on the dedicated track.

Route will cover 12 cities

There are about 12 cities including Agra, Lucknow, Varanasi and Patna between Delhi-Kolkata high speed route.

As per the report, the travel time for Lucknow, Varanasi and Patna will also decrease significantly once the high speed corridor is commissioned.

While the travel time for Lucknow is likely to be 1 hour 45 minutes, one will reach Varanasi in 2 hours 45 minutes from the national capital.

Delhi-Kolkata bullet train: Wow! From national capital to 'City of Joy' in just 4 hours 56 minutes! | Zee News
 
these all are just studies or shud I say, dreams being sold by the Govt. !! :dodgy

the mumbai-ahmedabad bullet route construction will only start in 2018.

so, we can very well judge abt these routes..... when they ll start, and when they ll finish :u
 
02133e840a5d5011404028f1cc7a5d20.jpg
 
shawl_who said:
these all are just studies or shud I say, dreams being sold by the Govt. !! :dodgy

the mumbai-ahmedabad bullet route construction will only start in 2018.

so, we can very well judge abt these routes..... when they ll start, and when they ll finish :u

Agreed. :lol
 
shawl_who said:
these all are just studies or shud I say, dreams being sold by the Govt. !! :dodgy

the mumbai-ahmedabad bullet route construction will only start in 2018.

so, we can very well judge abt these routes..... when they ll start, and when they ll finish :u
Atleast they are constructing highways andrail lines at a faster rate, what UPA did was introduction of new train and project every budget without funds and track as a result average speed reduced and constructing highway at a snail pace [emoji19]
 
Back
Top Bottom
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock