Yashvardhan Jain
Member
- Joined
- 15 May 2020
- Messages
- 3,544
- Reaction score
- 5,701
The ultra luxury Sir M Visvesvaraya Railway Terminal in Karnataka's capital city Bengaluru was made operational on 6th June
The station building of 4,200 sqm will cater to a daily footfall of 50,000. A foot over-bridge along with two subways will link all platforms. The terminal has seven platforms apart from eight stabling lines and three pit lines. Every day, 50 trains can be operated from the terminal. The escalators and lifts will connect seven platforms to facilitate passenger movement.
Some Images of the station
Source
The station building of 4,200 sqm will cater to a daily footfall of 50,000. A foot over-bridge along with two subways will link all platforms. The terminal has seven platforms apart from eight stabling lines and three pit lines. Every day, 50 trains can be operated from the terminal. The escalators and lifts will connect seven platforms to facilitate passenger movement.
Some Images of the station
India's first centralised AC railway terminal in Bengaluru becomes operational
According to the railway officials, the air-conditioned SMV Railway Terminal is a ₹314 crore project. It has solar rooftop panels and rainwater harvesting mechanism.
www.livemint.com
Last edited: