Full MNP: DoT extends deadline by two months

  • Thread starter Thakur
  • Start date
  • Replies: Replies 1
  • Views: Views 515

Thakur

Banned
Joined
30 Aug 2013
Messages
3,248
Reaction score
1,446
The Department of Telecommunications (DoT) has extended the deadline to fully implement the mobile number portability (MNP) across the country by another two months.

The earlier deadline to roll out ‘full MNP’ was May 3. “The government has decided to extend the date of implementation of the full MNP in the networks by two months,” an official statement said.

Telecom industry body COAI had sought extension for implementing nationwide MNP as telecom operators have to make some technical changes to their networks due to changes in national numbering plan (NNP) and this could take about 8 weeks.

The DoT has amended NNP asking telecom operators to allow their subscribers to dial on to mobile numbers within the same circle as well as inter circle without any prefix. Calls can also be made using the prefix ‘0’ and/or ‘+91′.

The DoT said various operators have already put in place hardware and software in their system required for implementation of full MNP.

“Internal testing by these operators is in advanced stage. The detailed final testing is schedule to commence shortly and is likely to be completed in two months for most of the operators,” the statement added.

The DoT said various steps were taken for implementation of full MNP. TRAI had also issued a regulation on February, 25, 2015 for the same, which prescribed the elaborated process/steps for implementation of full MNP in actual scenario when the number is to be ported.



http://m.tech.firstpost.com/news-analysis/full-mobile-number-portability-dot-extends-deadline-by-two-months-265873.html
 
Back
Top Bottom
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock